The new hotel consists of 8 storeys, with the residential block stepping from 7 to 4 storeys located to the west over a podium/basement car park, and the 5 no. townhouses span 3-storeys.
The ground floor entrance is situated on the road front and incorporates the public amenities of the hotel, restaurants, bars and conference room space and back of house areas to the rear. Additionally, the development includes landscaped gardens for the residents and 129 car park spaces across basement and surface level.
This project consisted of the supply and installation of the complete mechanical services installations including Gas Fired Water Heaters, General Ventilation, Dry Risers, LTHW Boilers, Domestic Water, Above Ground Drainage, Flues, Natural Gas and BMS.
Related Case Studies


