The hotel consisted of 6 storeys with a bar and restaurant, a gym, swimming pool and jacuzzi, conference facilities. It is located at Cambridge Square next to the train station
This was one on the first construction sites to reopen during the Covid lockdown.
This project consisted of the supply and installation of the complete mechanical services installations including LTHW Boilers with Domestic Hot Water PHEs, ASHP for pre-heat of Domestic Hot water, Chlorine Dioxide Dosing, Natural Gas, General Ventilation, Dry Risers, Domestic Water, Above Ground Drainage and BMS.